Stainless steel drinking unbreakable tumblers metal cups shatterproof
Only support oem/odm, no stock. Welcome to contact with us for your requirements!
Custom capacities (300–600 ml)
Finishes: brushed, mirror, black, gold, rose
Logos: laser, emboss, color print
Retail/gift packaging options
Tiered bulk discounts
Stable supply for bar chains & retailers
Consolidated shipping support
Strict QC with inspection reports
ISO / BSCI / SEDEX compliance
Materials: 304/201 stainless steel
Food-contact safe finishes
Traceable batches
| Model | Capacity | Finish | Material | MOQ | Use Case |
|---|---|---|---|---|---|
| Red Wine Goblet | 450 ml | Brushed / Mirror | SS 304 | 500 | Restaurants, Retail |
| Champagne Goblet | 250 ml | Gold / Rose | SS 304 | 500 | Hotels, Events |
| Portable Goblet Cup | 350 ml | Black / Silver | SS 201 / 304 | 1000 | Promotions, Gift Sets |
Design Brief: Capacity, finish, logo, packaging.
Quotation: Itemized EXW/FOB with lead times.
Sampling: Color & logo samples in 10–15 days.
Order: MOQ from 500 pcs per model.
Production: 30–40 days + QC inspection.
Shipping: Sea, air or express consolidation.
If you are looking for where to buy stainless steel wine goblets in bulk, source direct from Fordico — an OEM/ODM factory in Foshan, China. Buying from a manufacturer ensures you get consistent quality stainless steel goblets, full customization, and wholesale pricing that distributors can’t match.
Factory-direct quotes and samples
Private label stainless steel goblet programs
Global shipping with export documentation
Ready to discuss your goblet project?
Email: [email protected] | Send InquiryMost goblets are manufactured in food-grade 304 stainless steel; 201 stainless steel is available for cost-sensitive projects.
Yes. We customize capacity, finish, stem style, logos and packaging. Share your design brief to start sampling.
Buy direct from Fordico. As a certified OEM/ODM factory, we provide wholesale pricing, low MOQs and global shipping. Contact us for a quote.
Sampling: 10–15 days. Mass production: 30–40 days depending on finish and quantity.